INTERIM REPORT Q2 -2021

2021-09-24

Interim report for the period 1 January – 30 June, 2021

Baseload Capital Sweden AB (publ) today releases the results for the period 1 January – 30 June 2021

During the second quarter the focus has been on execution and business development in all of our active markets.

  • Profit/loss for the period was SEK -34.1 million, with revaluation of projects and loans to subsidiaries accounting for SEK -17.2 million, of which SEK -7.5 million consists of exchange rate differences as a result of a stronger Swedish krona.
  • In the US, the project company is still waiting for permission from the authorities to release geothermal water from the Wendel plant in a nearby stream, but the forecast is that the project can still be completed before the end of the year.
  • In Japan work is ongoing on the Sansui site which is expected to be commissioned before the end of the year. The project is the first part of the larger Waita 2 project that Baseload Power Japan and Furusato will develop together.
  • In Taiwan the exploration well at Westlake is being finalized. Flow tests have been conducted during the summer, but initial tests show less flow than expected.
  • In Iceland Baseload Power Iceland has been established. After the quarter the company has acquired Fludaorka and Reykholtsorka power plants including the expansion rights from Varmaorka. Pre-feasibility analysis is ongoing to set drill targets for each site.

The information was submitted for publication at 07:30 CET on 27 August 2021.

For more information, please contact:

Alexander Helling CEO of Baseload Capital

alexander.helling@baseloadcap.com

>> Get the full update from our quarterly report here.

RELATED POSTS

The first children’s book about geothermal energy released in Taiwan: Our Hidden powers 

The children's book "Our Hidden Power" from Sweden is officially published in Traditional Chinese – "我們的隱藏力量:風光水火土  打造永續地球", as the first children’s book in Taiwan to introduce geothermal and renewable energy.

BASELOAD POWER TAIWAN SIGNS MOU WITH ACADEMIC PARTNERS TO COLLABORATE ON GEOTHERMAL ENERGY EDUCATION AND TALENT DEVELOPMENT IN TAIWAN

Taipei, Taiwan (May 18, 2023) – Located along the Pacific Ring of Fire, Taiwan is known for its abundant geothermal energy, estimated at a potential 40GW.

地熱能源開發商倍速羅得攜手花蓮紅葉國小,齊力守護太魯閣族歌謠樂舞與文化傳承

花蓮縣萬榮鄉紅葉國小近年翻轉教育思惟,不囿於偏鄉匱乏,不盲目追求第一,重塑傳統文化課程,帶領孩子看見所處的美好土地與文化瑰寶,以作為獨一無二的部落後代,感到榮耀與自信。
1 2 3 8
menuchevron-down linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram